WeVote

Bill

Bill

HB 2367

Eliminating preferential treatment related to a coal-fired electric generating plant.

2025-2026 Regular Session Introduced by Liz Berry and 10 co-sponsors

Washington bill eliminates subsidies and preferential regulatory treatment for coal-fired power plants, affecting energy costs and coal industry viability.

Effective date 3/11/2026.
0