Directs BPU to establish virtual power plant program to reduce peak demand for electric energy.
Establish a statewide virtual power plant program to optimize demand and cut peak load by 500 MW by 2030 using DERs, storage, and managed EV charging.
Establish a statewide virtual power plant program to optimize demand and cut peak load by 500 MW by 2030 using DERs, storage, and managed EV charging.
A 3132 (NJ, Session 222) directs the Board of Public Utilities (BPU) to establish a virtual power plant (VPP) program aimed at reducing peak electric energy demand in New Jersey. The program would leverage distributed energy resources (DERs) such as home energy storage, solar-plus-storage, and managed electric vehicle (EV) charging, coordinated by DER aggregators and/or utilities. The goal is to improve grid reliability, defer costly infrastructure, and lower ratepayer costs while advancing clean energy and equity objectives.
Definitions:
program establishment and governance:
minimum filing requirements (within 12 months of enactment):
utility plan submission and oversight:
reporting and compliance:
regulatory framework:
effective date:
Compiled from official sources — confirm details with the bill’s official record.