Requires the MTA to submit an annual report on all contract cost overruns that exceed one million dollars
Imposes fixed THC limits: flower max 10% THC; inhalables capped at 5 mg per serving and 100 mg per package; bans added sweeteners, flavors, non-cannabis additives.