S01479 - Requires electric vehicle charging stations to be installed at gasoline stations when new gas dispensing motor fuel pumps are being installed at such gasoline station; prohibits building permits from being issued when there is not at least one electric vehicle charging station being installed at such gas station.
New York - 2023-2024 General Assembly
Introduced byMichelle Hinchey, Iwen Chu, Leroy Comrie
Last updated over 1 year ago
4 Co-Sponsors
STATUS
Introduced
Verifications Required
You must be a verified voter to do that.
No Thanks, I'll do it later
Verify your identity now