WeVote

Bill

Bill

RC 431

Para ordenar a la Comisión de la Región Norte de la Cámara de Representantes de Puerto Rico realizar una investigación exhaustiva a los fines de evaluar la problemática de inundaciones que persiste en los solares 182, 183, 184 y 184A ubicados en el Barrio Campanilla, Carretera PR-865, intersección con la carretera principal en el municipio de Toa Baja; identificar si existen estructuras o movimientos de terreno que impidan el libre y natural discurrir de las escorrentías pluviales; y para otros fines relacionados.

2025-2028 Session

RC 431 directs the North Region Commission to investigate Toa Baja flooding at solares 182–184A, assess if barriers block drainage (structures/soil movement), and propose remedies.

Referido a Comisión(es)
0
WeVote Research Nonpartisan
Bill Summary · RC 431

RC 431 — Summary of the Bill

Overview

RC 431 is a resolution introduced in the Puerto Rico House of Representatives. The bill directs the Commission of the Northern Region of the House to conduct an exhaustive investigation into a persistent flooding issue affecting specific properties in Toa Baja, and to evaluate whether structures or soil movements are obstructing the natural flow of rainwater runoff. The measure is described as a resolution, not a statute, and is intended to address related related purposes.

Purpose and Intent

  • To systematically assess the ongoing flooding problem on solares 182, 183, 184, and 184A located in Barrio Campanilla, at the intersection of PR-865 with the main road in Toa Baja.
  • To determine if there are any physical barriers—such as structures or ground movements—that impede the free and natural drainage of stormwater.
  • To identify additional related matters and potential remedies to mitigate flooding in the area.

Key Provisions (What the Bill Would Do)

  • Instructs the Commission of the North Region of the Puerto Rico House of Representatives to carry out an exhaustive investigation into the specified site.
  • Requires assessment of causes of flooding and any impediments to drainage, including potential structures or terrain shifts.
  • Calls for consideration of other related issues that may affect flooding and drainage, and to address them within the scope of the investigation.
  • The resolution language indicates the investigation and findings would be used to inform related actions or recommendations (for related purposes).

Affected Area and Stakeholders

  • Geographic focus: solares 182, 183, 184, and 184A, Barrio Campanilla, Toa Baja, at the intersection of PR-865 and the main road.
  • Stakeholders likely include nearby residents and property owners, local businesses, municipal authorities in Toa Baja, and agencies involved in flood management and drainage (e.g., local public works, environmental agencies).

Legislative History and Status

  • Introduced: September 12, 2025.
  • First Reading: September 18, 2025.
  • Referred to Committees: September 18, 2025.
  • Legislative Action: Reunión Ejecutiva (Executive Meeting) noted for December 2, 2025, by the Office of the Commission, indicating ongoing procedural processing.
  • Status note: “Reunión Ejecutiva: Oficina de la Comisión” reflects an executive committee step in the legislative process.

Potential Impacts and Implications

  • Procedural impact: Creates an official mandate for an investigative study by the North Region Commission, with a focus on local drainage and flood causes.
  • Policy impact: Could lead to recommendations for drainage improvements, land-use adjustments, or coordination with other government agencies.
  • Resource implications: The resolution itself does not specify funding; any recommended actions would depend on subsequent budget or appropriation decisions.
  • Public impact: May provide residents and property owners with a formal, structured assessment of flood drivers and potential mitigation options.

Next Steps

  • Monitor for committee reports or updates from the North Region Commission regarding findings, conclusions, and any proposed measures or recommendations.
  • If approved, prepare to engage with local stakeholders and relevant agencies as the investigation progresses.

Compiled from official sources — confirm details with the bill’s official record.

Sign in to ask a question.