A1323 - Makes supplemental appropriation of up to $10 million to DOT for construction of highway guard rail along entirety of Route 208 through Franklin Lakes, Wyckoff, Hawthorne, Glen Rock, Fair Lawn, and Oakland in sections without highway guard rail, where necessary to ensure health and safety of motorists and residents whose properties abut Route 208.
New Jersey - 2024-2025 Regular Session
Introduced byChristopher P. DePhillips, Shavonda E. Sumter, Lisa Swain
Last updated 9 months ago
4 Co-Sponsors
STATUS
Introduced
Verifications Required
You must be a verified voter to do that.
No Thanks, I'll do it later
Verify your identity now