Expediting Generator Interconnection Procedures Act of 2025

119th Congress
Introduced by Kathy Castor,

Expedite generator interconnection to the grid, speeding project deployment for renewables and other generators by standardizing timelines while preserving reliability and safety.

Introduced in House
0
0
Bill Summary • HR 2986

Summary of HR 2986 — Expediting Generator Interconnection Procedures Act of 2025

Basic bill information

  • Bill Number: HR 2986
  • Title: Expediting Generator Interconnection Procedures Act of 2025
  • Status: Introduced in House
  • Introduced: April 24, 2025
  • Committee Referral: Referred to the House Committee on Energy and Commerce (2025-04-24)
  • Sponsor: Kathy Castor (primary)

Purpose and intent (as suggested by the title)

HR 2986 aims to expedite the process by which electric generator projects connect to the power grid. The goal is to reduce delays in the interconnection process to speed deployment of new generation capacity, potentially including renewable energy, natural gas, and other resources, while maintaining reliability and safety standards.

Key provisions and changes (note on text)

The exact statutory text of HR 2986 is not provided here. Based on the bill’s title and typical features of interconnection-expedition measures, the bill would likely address:
- Establishing or tightening timeframes for interconnection queue processing and study steps (e.g., feasibility, system impact, and facilities studies).
- Standardizing interconnection procedures and documentation to reduce procedural variability.
- Clarifying roles and responsibilities among federal, regional, and utility/ transmission operators.
- Enhancing transparency by requiring published timelines, process steps, and queue data.
- Potentially adjusting cost-allocation or cost-sharing rules related to interconnection facilities and upgrades.
- Providing for expedited processes or pilot pathways for small-to-mid-scale generator projects.
- Ensuring compliance with reliability standards while accelerating review timelines.

Important: The above provisions are anticipated elements commonly associated with “Expediting Interconnection Procedures” bills. The actual text could differ, including different timelines, criteria, or mechanisms. For precise provisions, consult the official bill text once available.

Affected parties and potential impact

  • Generators and developers seeking to interconnect new capacity (renewables, storage, conventional generators) would be directly affected, potentially benefiting from faster processing.
  • Transmission operators, regional ISOs/RTOs, and utilities would implement standardized processes and meet new deadlines.
  • Ratepayers and consumers could be affected indirectly through changes in project timelines, cost allocation, and reliability considerations.
  • Regulators and policymakers would assess compliance with reliability and environmental standards under a tightened timeline.

Procedural and timeline aspects

  • The bill has been introduced in the House and referred to the Committee on Energy and Commerce.
  • There are no reported floor actions or Senate companion status in the provided summary.
  • If advanced, the bill would move through committee markup, potential amendments, and floor consideration before possible adoption.

Next steps for readers

  • Monitor committee actions on HR 2986 to see if hearings or amendments are scheduled.
  • Review the official text of HR 2986 upon release for precise provisions, timelines, and definitions.
  • Consider how expedited interconnection procedures could interact with reliability standards, state-level siting, and interconnection queues.

If you’d like, I can update this summary with the actual bill language and line-by-line provisions once the text becomes available.