HF899 - Electric utility renewable energy standard obligations modified, wind projects exempted from certificate of need proceedings, low-voltage transmission lines included in definition of solar energy generating system for siting purposes, and Public Utility Commission authority modified to issue site permits for electric generation facilities.
Minnesota - 93rd Legislature 2023-2024
Introduced byLucille Lucy Rehm, Mike Freiberg, Leon Michael Lillie
Last updated over 1 year ago
4 Co-Sponsors
STATUS
Introduced
Verifications Required
You must be a verified voter to do that.
No Thanks, I'll do it later
Verify your identity now