S08618 - Requires the office of renewable energy siting and electric transmission to establish a mapping, installation and efficiency plan for the purpose of building new electric transmission lines.
New York - 2023-2024 General Assembly
Introduced byKevin S. Parker
Last updated 7 months ago
1 Co-Sponsor
STATUS
Introduced
Verifications Required
You must be a verified voter to do that.
No Thanks, I'll do it later
Verify your identity now