S07821 - Provides that in the design, construction, maintenance, or renovation of any transit facility, transportation facility, or equipment of the metropolitan transportation authority, work shall take place over a continuous period of time until such point at which the project has been completed.
New York - 2023-2024 General Assembly
Introduced byWilliam J. Weber
Last updated 9 months ago
1 Co-Sponsor
STATUS
Introduced
Verifications Required
You must be a verified voter to do that.
No Thanks, I'll do it later
Verify your identity now