HB117 - Net energy metering; solar interconnection, cost recovery.
Richard C. Sullivan, Alfonso H. Lopez
Last updated 11 months ago
2 Co-Sponsors
Net energy metering; solar interconnection; cost recovery. Provides that an electric distribution company shall pay 33 cents ($0.33) per kilowatt-hour per day for the costs of lost electricity production for any and all delays beyond the regulatory notice period required by the State Corporation Commission related to net energy metering. The bill requires that, for the purposes of net energy metering, an eligible customer-generator shall bear all reasonable costs of equipment required at the eligible customer-generator's premises for the interconnection to the supplier's electric distribution system, including commercially reasonable costs of additional controls, tests, or liability insurance. Additionally, the bill allows for cost recovery by Phase I and Phase II Utilities for electric distribution grid transformation projects that support the interconnection of generating facilities using energy derived from sunlight that are owned or contracted by eligible customer-generators, subject to the Commission finding those costs to be reasonable and prudent in accordance with existing law. Net energy metering; solar interconnection; cost recovery. Provides that an electric distribution company shall pay 33 cents ($0.33) per kilowatt-hour per day for the costs of lost electricity production for any and all delays beyond the regulatory notice period required by the State Corporation Commission related to net energy metering. The bill requires that, for the purposes of net energy metering, an eligible customer-generator shall bear all reasonable costs of equipment required at the eligible customer-generator's premises for the interconnection to the supplier's electric distribution system, including commercially reasonable costs of additional controls, tests, or liability insurance. Additionally, the bill allows for cost recovery by Phase I and Phase II Utilities for electric distribution grid transformation projects that support the interconnection of generating facilities using energy derived from sunlight that are owned or contracted by eligible customer-generators, subject to the Commission finding those costs to be reasonable and prudent in accordance with existing law.
STATUS
Introduced
Verifications Required
You must be a verified voter to do that.
Error
You must be a resident or registered voter in this state.