S212 - Directs BPU to update interconnection standards for Class I renewable energy sources and develop fixed fee structure for interconnection costs.
New Jersey - 2024-2025 Regular Session
Introduced byRobert Smith, Linda R. Greenstein
Last updated 9 months ago
2 Co-Sponsors
STATUS
Introduced
Verifications Required
You must be a verified voter to do that.
No Thanks, I'll do it later
Verify your identity now