S2506 - Requires the public utilities commission (PUC) to produce a report by January 1, 2025 and each January 1 thereafter, on the ability for the current electric grid to handle the electrification load need to power cars, buildings, and heating of homes.
Rhode Island - 2024 Regular Session
Introduced byJessica de la Cruz, Gordon E. Rogers, Anthony Phillip Deluca
Last updated 7 months ago
3 Co-Sponsors
PUBLIC UTILITIES AND CARRIERS -- PUBLIC UTILITIES COMMISSION - Requires the public utilities commission (PUC) to produce a report by January 1, 2025 and each January 1 thereafter, on the ability for the current electric grid to handle the electrification load need to power cars, buildings, and heating of homes.
STATUS
Introduced
Verifications Required
You must be a verified voter to do that.
No Thanks, I'll do it later
Verify your identity now